Optimization of Construction Duration and Schedule Robustness Based on Hybrid GreyWolf Optimizer with Sine Cosine Algorithm
Mengqi Zhao
Xiaoling Wang
Jia Yu
Yao Xiao
Jun Zhang
出版
Infinite Study
主題
Mathematics / Applied
URL
http://books.google.com.hk/books?id=K6L7DwAAQBAJ&hl=&source=gbs_api
EBook
SAMPLE
註釋
Construction duration and schedule robustness are of great importance to ensure ecient construction. However, the current literature has neglected the importance of schedule robustness. Relatively little attention has been paid to schedule robustness via deviation of an activity’s starting time, which does not consider schedule robustness via structural deviation caused by the logical relationships among activities. This leads to a possibility of deviation between the planned schedule and the actual situation.